Checksheet between Moulder / Toolmaker / Material
Manufacturer/Industrial Designer/Customer, etc.
FIRST-OFF MOULD INSPECTION
CARRIED OUT BY:
MOULDER/YPEC:
NAME:
IT WILL SAVE TIME AND TIME MEANS MONEY
Checksheet (Standard for Conventional Moulds)
1. Sprue bushing size / radius suite machine?
YES/NO
2. Ejector bar length suits machine /mould?
YES/NO
(Also check type of ejection, i.e. centre or edge)
3.Size of mould fits machine available for test?
YES/NO
4.Lifting eye-bolt installed is an approved make and a good fit in tool?
YES/NO
5.If unorthodox loading of mould to machine, is it clearly stamped on tool?
YES/NO
6.Are air, oil, grease, hydraulics inlets clearly marked?
YES/NO
7.Cavities are polished to agreed standard?
YES/NO
8.Cores are polished to agreed standard?
YES/NO
9. Cavities and cores are hardened? If NO, has this been agreed between moulder/mould maker? YES/NO
10. Check if die plates are hardened or soft
YES/NO
11. Cooling channels been bench tested for leaks? YES/NO
12. Has the mould been vented? YES/NO
13. If multi-cavity mould, are the cavities numbered and correctly sequenced? YES/NO
14. Are water fittings available for mould?
YES/NO
15. Does ejection move freely? YES/NO
No comments:
Post a Comment